The above entries detail a series of anomalous situations within Site-96 during the timeframe of January 20??. Initial reports indicated a potential breach concerning SCP-XXXX, leading to a rapid escalation. Containment efforts were partially successful in mitigating the threat, resulting in signifi
On Cycle/Day/Timestamp 8, an unusual occurrence/event was observed within Site-96. The incident involved personnel/D-Class/Equipment and resulted in minor/moderate/significant damage/contamination/alteration. Details/Observations/Findings of the incident are pending and will be released/made availab
The latest entry log for Site-96 here indicates persistent anomalies. Personnel report frequent instances of equipment malfunction, accompanied by unusual electromagnetic readings. Investigation into this matter is currently underway. Dr. ??????? has been deployed to the site to assist with containm
The recent incident at Site-96 involved a breach of containment with an anomalous object. The breach occurred on date at time, resulting in the damage of several workers to the anomalous entity. The incident was contained after hours/minutes by a squad utilizing classified containment protocols.
P